Organisation | Project title | Project description | Total funding (NPA and State contribution) (ex. GST) |
---|---|---|---|
Alpine Shire Council |
Flood Study of Myrtleford and the Ovens and Buffalo Rivers |
The project will undertake a detailed flood study to determine flood levels and extents for a range of flood frequencies for the townships of Myrtleford, Ovens and the rural locations across the middle Ovens and Buffalo River floodplains. |
$165,000 |
Baw Baw Shire Council |
Baw Baw Shire Attentis Sensor Installation |
The project seeks to install Attentis Sensors at priority locations across the Baw Baw Shire to enable access to live information about environmental events within the range of the network, such as real-time fire and flood detection, live wind movement, rainfall, soil moisture and ground movement. |
$192,000 |
Baw Baw Shire Council |
Static Water Supply for Walhalla |
The project seeks to install an 80,000-litre water tank at the Southern end of Walhalla. This water tank will provide a dedicated water supply for firefighting in the event of a bushfire. |
$15,915 |
Baw Baw Shire Council |
Flood Mitigation Study for Hazel Creek, Warragul and Contour Drain, Trafalgar |
The project will undertake a study to investigate the options to increase the capacity of Hazel Creek and Contour Drain. This includes identification of flooding hotspots and detailing strategies to improve the capacity/ flood mitigation options. |
$30,000 |
Benalla Rural City Council |
Winton Flood Scoping Study |
The project will undertake a flood scoping exercise to collate available flood information in relation to Winton to understand and characterise the flood risk in the township. The study will focus on Winton Creek and Seven Mile Creek. |
$40,000 |
City of Greater Bendigo |
Bendigo Creek Levee Design |
The project will develop the concept and detail design of the Bendigo Creek Levee from Racecourse Creek at the Midland Highway to Leans Road. |
$480,000 |
City of Greater Geelong |
Lara Flood Mitigation Detailed Design |
The project will seek to produce a detailed design for flood mitigation within north eastern Lara. The design will look to mitigate identified flood impacts and improve the flood frequency in the northern Lara areas. |
$50,000 |
Corangamite Catchment Management Authority |
Survey Above-Floor Flooded Properties in Colac |
The project aims to use the outputs of the Deans Creek and Barongarook Creek Flood Study to identify and survey the properties identified within the flood extent, to determine which properties are likely to experience above floor flooding. |
$33,500 |
Corangamite Catchment Management Authority |
Flood Hazard Assessment Mapping for Future (2070) Sea Level Rise Scenario |
The project will undertake a study to determine the impacts of flooding based on the year 2070 coastal inundation scenario in the Barwon Heads, Lake Connewarre, Breamlea and Ocean Grove areas. |
$17,250 |
Emergency Management Victoria |
Victorian Impact Assessment Project |
This project will strengthen impact assessments through the development of IT tools that can effectively share impact information through interoperable systems across government departments and agencies. |
$200,000 |
Gannawarra Shire Council |
Koondrook Flood Mitigation Infrastructure |
The project will develop design construction drawings for the Koondrook flood mitigation infrastructure, addressing the significant risk of flood (riverine and overland). |
$100,000 |
Glenelg Shire Council |
Fitzroy Darlot Regional Flood Investigation Implementation Project |
The project will strengthen the flood risk planning controls for the township of Heywood, including planning scheme amendments to insert the necessary planning controls into the Glenelg Planning Scheme. |
$40,000 |
Golden Plains Shire Council |
Teesdale Flood Study |
The project will undertake a flood study to determine the potential impacts of riverine flooding in Teesdale. Flood mapping will contribute to the update of planning schemes and will highlight risks to aboriginal heritage assets, properties, roads, and infrastructure. |
$162,700 |
Greater Shepparton City Council |
Katandra West Flood Scoping Study |
The project will undertake a flood scoping exercise to collate all available flood information to understand and characterise the flood risk in and around Katandra West and undertake an assessment of the flood risk of the township. |
$40,000 |
Lake Tyers Aboriginal Trust |
Wood Harvesting |
The project will complete bushfire mitigation works to reduce both the existing risk and minimise the future disaster risk in the Lake Tyers Aboriginal Trust area. |
$100,000 |
Latrobe City Council |
Waterhole Creek and Tributary Flood Study |
The project will undertake a flood study to update flood levels and flood risk of Waterhole Creek and its associated tributaries, within the township of Morwell and surrounding areas. |
$66,000 |
Loddon Shire Council |
Korong Vale Flood Study |
The project will undertake a flood study to improve the accuracy of estimated flood levels and extents for a range of flood events in the Korong Vale and immediate surrounding rural area. |
$78,000 |
Mount Alexander Shire Council |
Harcourt Flood Study |
The project will undertake a flood study to determine the potential impacts of flooding in Harcourt. |
$120,000 |
Nillumbik Shire Council |
Resilient St Andrews |
This project will develop and deliver a community emergency education program that will strengthen relationships, build capacity, and create ongoing resilience to bushfire for St Andrews and surrounds. |
$250,000 |
North Central Catchment Management Authority |
Pental Island Levees |
This project will examine existing Pental Island levees and floodway to better understand the level of protection and assist to determine appropriate future management arrangements. |
$108,000 |
North Central Catchment Management Authority |
Rapid Flood Risk Assessments |
This project will undertake rapid flood risk assessments for seven townships and four rural areas to support local community resilience and understanding of flood risks. |
$158,000 |
North Central Catchment Management Authority |
Flood Warning Prediction Service for Carisbrook |
This project will design a fit-for-purpose flood warning system for Carisbrook to help the town and its community prepare for future flood events. |
$28,000 |
Northern Grampians Shire Council |
Marnoo Flood Study |
This project will undertake a flood study for the township of Marnoo. |
$64,000 |
Northern Grampians Shire Council |
Stawell Flood Investigation |
This project will undertake a flood investigation in Stawell. |
$132,000 |
Parklands Albury Wodonga Limited |
Building Wodonga's Resilient Communities, Eco-systems and Park Infrastructure |
This project aims to minimise the creation of future disaster risk by adaptive design for floodplain park infrastructure, strategic plantings to slow storm-water run-off onto floodplains, and establishing a seedbank orchard of climate adapted native trees, shrubs and ground layer species. |
$114,000 |
Southern Rural Water |
SRW Flood Gauge and National Flood Warning Infrastructure Standard Gap Analysis |
This project will use the National Flood Warning Infrastructure Standard (2019) to perform a gap analysis between the current performance of Southern Rural Water's flood gauges and that required by the Standard. |
$50,000 |
Strathbogie Shire Council |
Emergency Relief Centres Infrastructure Resilience Project |
This project seeks to reconfigure the electrical power supply at each of the Council's five nominated Emergency Relief Centres to enable mobile trailer mounted liquid fuel generators to be connected. The generators will restore and/or maintain power and functionality of these sites in the event of an emergency. |
$32,500 |
Victoria State Emergency Service |
Community Emergency Risk Assessment Online – Enhancements |
This project will carry out enhancements to the Community Emergency Risk Assessment Online platform. The project will enable more detailed and accurate risk assessments and better access for municipal members to participate in the risk assessment process. |
$50,000 |
Warrnambool City Council |
South Warrnambool Flood Investigation |
This project will undertake a flood investigation to determine the impacts of flooding at, in and the surrounds of South Warrnambool. The project will assess flood risk and help to determine mitigation strategies. |
$200,000 |
Yarra Ranges Council |
Cooler, Safer Buildings Yarra Ranges |
This project will upgrade eight key buildings in the area, so that they are more resilient and fit for purpose as refuges during times of need. |
$110,000 |
These link(s) will open in a new browser window.
You may need Adobe® Acrobat® Reader or Libre Office to view the document(s) on this page.
Get Adobe® Acrobat® Reader (External link)
Get Libre Office (External link)
If you would like to receive this publication in a more accessible format, you can request it via our feedback form.